Pump Reconditioning/Repair
Final Bid: $38,900.00
Bid Number 31: $39,400.00
Bid Number 30: $41,800.00
Bid Number 29: $41,800.00
  
Bid Number 2: $75,000.00
 First Bid:$75,000.00
 
Reverse-Auction ID:   1898
Date Ended: April 08, 2002
Duration:   20 days   6 hr  
Start:   Tue Mar 19, 2002 at 9:00 am CT
End:     Mon Apr 8, 2002 at 3:00 pm CT
Category:   Electrical

Qty: 1   Unit: Lot
Circulating Water Pump 1A
Peerless Vertical Turbine Pump
42HXB
30,000 GPM
575 RPM
Serial Number 209632

The participating vendors will demonstrate the technical knowledge and experience with the specified or similar circulating water pumps. The participating vendors will provide a list of current and past circulating water pump repair projects whereby they plan labor, materials and equipment required for repairing circulating water pumps. This list will include nature and type of work performed and total direct and indirect labor hours required.

Requirements for additional repair work, if any, will be reported to GP&L, including an estimated completion date for any services/work to be provided and the relate costs of such work. All additional work will require GP&L approval before the work begins. If unforeseen delays extend the completion date the participating vendor shall immediately notify GP&L.

Parts repair/replacement:

Part Number

Description

Quantity

Work Required

2621866

tube nut

1

replace

T102944

tube/column

1

replace

T102945

lower tubes

5

replace all

2622011

tube adapter

1

replace

2712863

bearing, tube

7

replace all

2623770

bearing

2

replace

2623769

bearing

3

replace

T64449

bearing, lower tube

1

replace

2621706

bearing, upper tube

1

replace

T101173

rubber bearings

 

install

2621920

impeller

1

repair wear ring and blades

2618459

suction manifold

1

repair wear ring and replace bushing

V1000A-11

shaft, upper

1

repair or replace



Online Bid Procedures:

The Seller need not be licensed.

The Seller need not be ISO compliant.

This item requires setup from the Seller
Setup need not be included
Buyer will not pay for setup

Buyer will not accept substitutes

Other criteria:
The City of Garland reserves the right to reject any and/or all bids.  Click here to see The City of Garland's Terms and Conditions.

If awarded the business you must complete and sign the following forms:

Click here for Insurance Requirements and Agreement

Click here for Indemnification Agreement

NOTE: This pump is currently disassembled and available to view at the Olinger Power Plant, 13835 County Road 489, Nevada, TX, 75173. Participating vendors are required to complete an onsite inspection of the pump prior to bid submission. Visits to the plant site will be coordinated through Mark Dailey, GP&L, 972-205-3034.

Any technical questions will be referred to Randy Harper or Mark Dailey. City prefers questions being asked online using the Q&A (question and answer) form accessible by pressing this button:

Reconditioning/repairs of the specified circulating water pump will be based on the following job scope:
1. Pick-up and delivery:

   a. Vendor is responsible for pick-up and delivery of pump.

   b. Pump will be picked-up at GP&L, Olinger Power Plant, 13835 County Road 489, Nevada, TX, 75173.
   
   c. Repaired pump will be delivered to GP&L, Olinger Power Plant, 13835 County Road 489, Nevada TX, 75173.

2. Parts repair/replacement

3. Bids from participating vendors will include the following:

   a. Cleaning and inspection of all parts
   
   b. Labor to reassemble pump

   c. Performance of required tests, if any

   d. Pick-up and delivery of pump

4. Adherence to the following guidelines is required:

   a. Bids will show break-out (separate) quotes for new or reconditioned bearings.

   b. All work, services, materials and supplies provided in conjunction with this work scope shall meet or exceed the manufacturer’s original specifications, as well as any and all standards and requirements mandated and/or recommended by applicable regulatory agencies, e.g., The American National Standards Institute (ANSI), Hydraulic Institute Standards, and the Occupational Safety and Health Administration (OSHA), as well as any and all applicable local, state, and federal regulations.

   c. A completion report will be required before payment of services. The report shall contain:

       1. A description of work/service and date(s) performed.

       2. Pre- repair condition of disassembled pump, including as found clearances.

       3. All work completed on the pump.

       4. A schedule of labor rates.

       5. Cost and description of materials and supplies, including percentage discount/mark-up (must be accompanied by a copy of the manufacturer’s current invoice price for each item).

       6. Job scope total labor and/or material/supplies cost.

       7. A copy of all applicable test data.

       8. Copies of all photographs, if any.


Contact Us | Privacy Policy | Membership Agreement